7/1/2025 - NOTICE OF PRELIMINARY DECISION TO ISSUE AUTHORITY TO CONSTRUCT
Pursuant to Rule 207, Section 6.9, the Monterey Bay Air Resources District (MBARD) solicits written comments to the preliminary decision to approve the issuance of Authority to Construct (ATC) APP-25-00014 to Monterey One Water (M1W) for the modification of the existing anaerobic digestion system. The modification is for the installation and operation of a new co-digestion project/food waste processing facility with a maximum throughput of 51,000 tons per year. The equipment will be located at 14811 Del Monte Blvd. in Marina
The facility-wide volatile organic compound (VOC) emissions are greater than or equal to the Offset threshold limits listed in Sections 4.2 and 5.3 of Rule 207. As demonstrated in MBARD’s Evaluation Report, the co-digestion project/food waste processing facility project meets the requirements of Part 4 and Part 5 of Rule 207. Hence, MBARD’s preliminary decision to approve the projects is being proposed because the facility has the capability of complying with all applicable MBARD rules and regulations
Evaluation ReportAviso PublicoPublic Comments: The public has an opportunity to review and comment on the proposed project. Written comments must be submitted by email or mail to the address below and be postmarked by Thursday July 31, 2025.
Email: ajimenez@mbard.org
Mail: Monterey Bay Air Resources District, Attention: Armando Jimenez, 24580 Silver Cloud Court, Monterey, CA 93940